    Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops

    Get PDF
    This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be distributed between the factories and then assignment of products to factories and sequencing of the products assigned to each factory has to be derived. The objective is to minimize the sum of setup costs, work-in-process inventory costs and finished products inventory costs per unit of time. Since the proposed model is NP-hard, an efficient Water Cycle Algorithm is proposed to solve the model. To justify proposed WCA, Monarch Butterfly Optimization (MBO), Genetic Algorithm (GA) and combination of GA and simplex are utilized. In order to determine the best value of algorithms parameters that result in a better solution, a fine-tuning procedure according to Response Surface Methodology is executed

    A Continuous Review inventory Control Model within Batch Arrival Queuing Framework: A Parameter-Tuned Imperialist Competitive Algorithm

    Get PDF
    In this paper, a multi-product continues review inventory control problem within batch arrival queuing approach (MQr/M/1) is modeled to find the optimal quantities of maximum inventory. The objective function is to minimize summation of ordering, holding and shortage costs under warehouse space, service level, and expected lost-sales shortage cost constraints from retailer and warehouse viewpoints. Since the proposed model is Np-Hard, an efficient imperialist competitive algorithm (ICA) is proposed to solve the model. To justify proposed ICA, a simulated annealing algorithm has been utilized. In order to determine the best value of algorithms parameters that result in a better solution, a fine-tuning procedure is executed. Finally, the performance of the proposed ICA is analyzed using some numerical illustrations

    A bi-objective hybrid vibration damping optimization model for synchronous flow shop scheduling problems

    Get PDF
    Flow shop scheduling deals with the determination of the optimal sequence of jobs processing on machines in a fixed order with the main objective consisting of minimizing the completion time of all jobs (makespan). This type of scheduling problem appears in many industrial and production planning applications. This study proposes a new bi-objective mixed-integer programming model for solving the synchronous flow shop scheduling problems with completion time. The objective functions are the total makespan and the sum of tardiness and earliness cost of blocks. At the same time, jobs are moved among machines through a synchronous transportation system with synchronized processing cycles. In each cycle, the existing jobs begin simultaneously, each on one of the machines, and after completion, wait until the last job is completed. Subsequently, all the jobs are moved concurrently to the next machine. Four algorithms, including non-dominated sorting genetic algorithm (NSGA II), multi-objective simulated annealing (MOSA), multi-objective particle swarm optimization (MOPSO), and multi-objective hybrid vibration-damping optimization (MOHVDO), are used to find a near-optimal solution for this NP-hard problem. In particular, the proposed hybrid VDO algorithm is based on the imperialist competitive algorithm (ICA) and the integration of a neighborhood creation technique. MOHVDO and MOSA show the best performance among the other algorithms regarding objective functions and CPU Time, respectively. Thus, the results from running small-scale and medium-scale problems in MOHVDO and MOSA are compared with the solutions obtained from the epsilon-constraint method. In particular, the error percentage of MOHVDO’s objective functions is less than 2% compared to the epsilon-constraint method for all solved problems. Besides the specific results obtained in terms of performance and, hence, practical applicability, the proposed approach fills a considerable gap in the literature. Indeed, even though variants of the aforementioned meta-heuristic algorithms have been largely introduced in multi-objective environments, a simultaneous implementation of these algorithms as well as a compared study of their performance when solving flow shop scheduling problems has been so far overlooked